1) Before: This house in Waukesha needs a
new roof. The following photos will show the
progress of the job.
2) Tear off in progress: The existing cedar
shakes are being removed and disposed of.
Note the tarps to protect the landscaping
around the house!
3) Bare Roof: This is the opportunity to inspect
the roof deck. We will correct any carpentry
issues, add ventilation if necessary, and be
sure the building is ready for a new roof.
4) Prepped: The replacement process
begins. Edging, Ice and Water Shield,
roofing felt and valleys are now installed.
Chimneys and other projections are
prepared for flashing.
5) Shingling in Process: The new shingles
are carefully and professionally installed per
the manufacturers instructions by our trained
personnel.
6) Finished Product: Care is taken to contain
all debris. The dumpster is removed, driveway
and sidewalks swept and the job is inspected
by a member of the L.H. Krueger and Son staff.
Another beautiful job!
This page is a walk-through of a re-roof from start to finish.
It illustrates the steps and actions taken during the course
of a typical job.
This house had its old cedar shake roof removed and
replaced with a GAF-ELK Pemium Designer Shingle. The
shingles installed on this house emulate the look of cedar
shakes and carry a limited lifetime warranty, as well as a
limited wind warranty of up to 110 MPH.
Click on each picture for an enlarged view so you can
better see each step of the process.
To learn more about the re-roof process click me!